Skip to content
Industries · Construction

A name on every point lost, subcontractor by subcontractor.

The Construction pack switches on 34 concerns, 25 detected today. Every event lands on the zone's subcontractor, so the Monday meeting has a name, a number and an action instead of a video clip.

Main Contractor · Al Quoz Site / Overview

Good morning. Here is where the site stands.

Safety score

87

Grade B · up 4

Worst subcontractor

61

Alpha MEP · grade D

Blocked minutes

41

Mostly one exit

Near misses

3

Yard Drive Lane

Open events

  • P1Emergency exit blockedcam-03Store Emergency Exit · Priya Nair6 min
  • P2No hard hatcam-01Slab Area Work Floor · Alpha MEP08:05
  • P2Electrical panel access blockedcam-01DB-3 Electrical Panel · Beta Steel4 min

The challenge

  1. 01

    Exits become material stores

    "The fire escape on level three gets used as a material store, and I only find out on the Friday walk."

  2. 02

    Nobody's name is on the number

    "Everyone agrees at the Monday meeting and nothing changes, because nobody's name is on the number."

  3. 03

    Eight subcontractors, three shifts

    Fifty cameras, and the only time anyone looks at them is after an incident.

A typical event, handled

The camera catches it, the zone rule decides, the owner is told in seconds, and the event closes when the camera sees it cleared.

  • No hard hat · Alpha MEP
  • Exit blocked · 6 min

What the pilot is judged on

3wks
From signing to alerts going live
0
New cameras or re-cabling needed
↓
Blocked minutes at your emergency exits
↓
Near misses between people and vehicles

The pilot

Live on your own cameras in about three weeks

A paid four-week pilot on about ten cameras, judged on one number your team already cares about: how long the emergency exits stay blocked.

  1. 01

    Day one

    Discovery call

    A 45-minute call to pick the cameras that matter: exits, vehicle routes, panels and PPE areas, and who owns each one.

  2. 02

    Week 1

    IT request

    Your IT team creates a read-only account on the recorder and gives the edge box one switch port. No port forwarding, no inbound connections, no recording changes.

  3. 03

    Week 1

    Install

    Half a day on site. The box is online about ten seconds after the installer runs, and ten cameras take about ten minutes to add.

  4. 04

    Week 1

    Zone workshop

    Two hours with your HSE lead to draw 10 to 20 zones, each with a named owner. You can redraw them yourself afterwards.

  5. 05

    Weeks 1–2

    Shadow mode

    Two weeks of events with no alerts, so the zones and thresholds are tuned on your site before anyone gets a notification.

  6. 06

    Week 4

    Review

    Alerts go live for exactly two concerns, then a one-hour review of blocked minutes, near misses and the scorecards, worst first.

Put your industry pack on your cameras

A four-week pilot on about ten of your existing cameras, with zones drawn and owned by your own team.

Frequently asked questions

  • No. A pack is a starting point, not a licence boundary. Every concern in the catalogue stays available, nothing is charged per concern, and the score formula is the same in every pack.

  • Where hard hats are worn and the camera sees each head at a usable size, yes. Your pilot checks every PPE camera during shadow mode before any PPE alert is switched on.

  • Yes. Add the client's HSE representative as a viewer on your site. They see the same scores, events and reports, read only.